01 February 2011

Let Me Be

In February 2009 I started making "Let Me Be" designed by Quilt Soup.


The quilt top was sewn together in March 2009 and sat in the sewing room till November last year when it was basted ready for quilting.  Quilting didn't start until last Saturday afternoon.

Ditch-stitching the blocks and borders
For some reason Blogger refuses to load this photo correctly today - I've tried 3 times
Outlining the appliques and meandering
Backing - 3 Sisters "Sanctuary" (Moda fabric)
Quilting was finished Sunday evening.  The binding is ready to be sewn on but it was too hot last night.  This quilt is a departure for me from colours I usually choose - there's a lot of mauve.

We have had a couple of changes at home and some furniture has been moved from one room to another.  A desk became free, so it's been re-painted and is in the sewing room to hold the embroidery machine.


Summer has arrived in Australia with a vengeance - so hot in many areas and cyclones are causing more devastation in Queensland.

29 January 2011

Little Patchwork Village

Lovely cool-ish day on the South Coast today.  It's been great having a few days off.  I've vliesofixed the last flowers onto Girls Day Out and that will be my next lot of night-time stitching now that the Little Patchwork Village blocks are stitched.

Neighbours

Posh

Quilt Shop
I'd like to start quilting "Let Me Be" later today and when that's finished (in a few days) I'll put together the Little Patchwork Village.

27 January 2011

12-1/2" BOM

I'm on holidays for a couple of days and am hoping to make some progress on a couple of UFO's. I finished putting the borders on our on-line group's BOM earlier today. Pretty windy outside so this is the best photo I could get.

I really wanted to make the ribbon border and to make it fit I had to make the cream inner border 2" finished for the top and bottom and 1" finished for the sides. I'm hoping to use up the leftover fabrics for the backing but am pretty sure that when sewn together the backing won't be big enough. Something will turn up.

Finished Quilt Top
The girls chose great blocks and I'm thrilled to bits.

Back to the sewing room to start the next SBS block and choose a UFO.

25 January 2011

Sylvia's Bridal Sampler

The new year, and the fact that Diann has been choosing simpler blocks to get us going, has brought along enthusiasm for these blocks.

Anvil
Churn Dash
All the blocks made so far hanging on the design sheet.
I'm still not keen on foundation piecing and was very surprised to see how many blocks in the quilt are pieced this way.

1-1/2 Little Patchwork Village blocks to stitch.  I'm looking forward to sewing this wallhanging together - it will be a nice change for the wall in my sewing room.  I've had Leanne's House hanging there for the last 4 years.

24 January 2011

Peta's Day Out

On Wednesday Peta had a huge day out - swimming with the sharks at Manly Aquarium.



Last year Peta decided this was something she'd like to do during her holidays.  She's so brave.  Michael went along for moral support.


Our family is full of surprises - skydiving, swimming with sharks.  Wonder what's next?

22 January 2011

Little Patchwork Village

First week back at work is over.  Hooray.  I am grateful to have a job so close to home and working with people I really like, but it was so difficult to work up the enthusiasm needed to turn up on Monday morning after such a relaxing holiday.

Two highlights this week:  stitching group on Tuesday night - was lovely to meet up with the girls; and on Thursday our dear friends from Hobart, who have been holidaying on the South Coast, came to stay over.

Next week only 2 days at work:  with Wednesday being Australia Day and Friday is our RDO, I thought it wise to take Thursday as an A/L day.

During the last week off I stitched another "Little Patchwork Village" block

Sunday Afternoon
and this week I've stitched

Tree House
Three more blocks to stitch.

No other sewing this week but plans are being made - Diann thinks it's time to cut into a jelly roll and we might each make Floral Bouquet from the Jelly Roll Quilts book.  I need to work out if I have enough background fabric in my stash.  I am using "Bliss" and think Snow would look better than pure white.  Of course, I have 10 yards of pure white and probably not quite enough Snow- it will work out.

18 January 2011

Back on Track

Diann and I are continuing with Sylvia's Bridal Sampler this year.  I am in no way a fan of foundation piecing and many of the blocks are constructed using this method, so I was pleased (surprised) to find this block came together well with lovely sharp angles.

Our plan, in an effort to keep up the enthusiasm level, is to make a stack of the easier blocks and then move onto some challenging blocks.  A couple of the blocks we attempted last year (eg Tennessee, New Mexico) really threw me.

Album 1
I'm still in love with this Oh Cherry Oh fabric and have so much that I'm planning to use it for our on-line group's 2011 BOM as well.

Stitching group starts back tonight after our Christmas break.  I might work on a Butterfly Garden block.  I have so many stacks of fabric ready to cut into and patterns waiting to be sewn/stitched but I really should make an effort to work on some of my WIP's.

LinkWithin

Related Posts Plugin for WordPress, Blogger...